Cat A falls as the rest increase

Cat A falls as the rest increase

In round two of February's COE bidding exercises, Category A premiums fall to a new record low of $43,000 down $3,651 from two weeks ago.

OneShift Editorial Team
OneShift Editorial Team
17 Feb 2016

Rising from the previous dip to $38,610, Cat B COEs have now climbed once again to $46,970.

Open Category premiums also climbed marginally by $1,008 to close at $45,009, bringing all the premiums to within less than $5,000 of each other.

Credits:

Local News
Other Articles
Explore moreright arrow
Lambency Detailing Gets GTECHNIQ Accreditation At Both Singapore Outlets
GAC Opens Fourth Singapore Showroom In Yishun
Toyota's Asia Esports Championship 2026: Indonesia Takes Home The Big Win
get quote bg
Sell your car at the highest price in Singapore
  • pros
    Convenient and Hassle-Free
  • pros
    Consumer Protection
  • pros

    Transparent Process
    With No Obligation

Related Articles
LTA awards Tender to develop Next-Generation ERP System
The LTA has awarded a tender to develop a next-generation ERP system to the consortium of NCS Pte Ltd and Mitsubishi Heavy Industries Engine System Asia Pte Ltd. The new system, set to be rolled out from 2020, will see the existing ERP infrastructure being done away with, and in its place will be the utilisation of a Global Navigation Satellite System (GNSS) Technology. This next-generation ERP system will allow for more flexibility in managing traffic congestion through distance-based road pricing, where motorists are charged according to the distance travelled on congested roads, which would be fairer to motorists. It will also be able to overcome the constraints of physical gantries, which are costly and take up land space. Age is also a factor, and older gantries are beginning to be too expensive to be considered practical to maintain them on a long term basis. The new system is expected to be implemented progressively from 2020.  To ensure a seamless transition, there will an 18-month switchover period to transit from the current ERP system to the new system. The government will also bear the one-time IU replacement costs for Singapore-registered vehicles. Pictures used for illustration purposes only.
Local News
COEs fall sharply for Cat B in Feb round 1
The first bidding exercise for the month of February has ended lower across the board than the previous round of bidding.
Local News
SG: New Flyover to be built from Seletar West Link to SLE
The LTA has awarded a contract to Samwoh Corporation Pte Ltd for the construction of a flyover from Seletar West Link to SLE. Once completed, the structure will boast a one-lane road from Seletar West Link to SLE (Westbound) at the CTE/TPE/SLE interchange. It will also provide a direct link between Seletar Aerospace Park/Yishun Town and SLE in the west bound direction. Works will commence soon and is expected to be completed in 4th quarter of 2018. Pictures used for illustration purposes only.
Local News