SG: LTA awards 2 contracts to widen roads

SG: LTA awards 2 contracts to widen roads

The LTA has recently awarded 2 contracts to Kim Peow Contractors (Private) Limited and Samwoh Corporation Pte. Ltd. repectively. Kim Peow Contractors will be widening the existing Tanan Merah Coast Road, whilst Samwoh will be construction a new road between Tanah Merah Coast Road and Aviation Park Road. It is hoped that the widening of Tanah Merah Coast Road can alleviate its current congestion and cope with the added traffic from the new dual 3-lanes road between Tanah Merah Coast Road and Aviation Park Road, which is located near the eastern coastline of Changi East. The new road will replace Changi Coast Road, and help facilitate Changi Airport Runway 3 and Terminal 5 development works. Both works are scheduled for completion by 2nd quarter 2017.Pictures used for illustration purposes only.

OneShift Editorial Team
OneShift Editorial Team
24 Apr 2014

Credits:

Local News
Other Articles
Explore moreright arrow
"Plug-in Hybrids have relevance in Singapore due to high-rise living": Interview with Liu Xueliang, General Manager, BYD Asia Pacific Auto Sales Division
You Can Now Order New Porsche 911 Carrera 4S Variants In Singapore
Range Rover Sport SV Black Edition Exudes A Broad-Shouldered Attitude
get quote bg
Sell your car at the highest price in Singapore
  • pros
    Convenient and Hassle-Free
  • pros
    Consumer Protection
  • pros

    Transparent Process
    With No Obligation