Traffic Arrangements for Singapore GP
Traffic Arrangements for 2010 FORMULA 1 SINGTEL SINGAPORE from 22 September 2010 to 26 September 2010.

A series of road closures affecting the Marina Centre area will take place from 22 September 2010 to 28 September 2010 to facilitate the setting up and dismantling of the race infrastructure.
The following roads towards the city (1-way through traffic) will be opened to all commuters during morning peak hours (5.00 am - 9.30 am), on 22 September 2010 to 24 September 2010:
a) Nicoll Highway
b) Esplanade Drive
c) Republic Boulevard
d) Bayfront Avenue
e) Temasek Avenue between Raffles Boulevard and Raffles Avenue
On 25 September 2010 (Saturday), only Nicoll Highway and Esplanade Drive (1-way through traffic) will be opened between 5.00am and 9.30am.
The road closures and restricted access details are as follows:
[IMG]http://www.oneshift.com/showroom/uploadimages/resized-20100923100935662.jpg[/IMG]
In addition to the road closures, on 21 September (Tuesday), two lanes of Esplanade Drive in both directions would be closed from 9.30 am onwards to facilitate set up of the Connaught Grandstand. Traffic at this junction is expected to be slow moving when the lane closures are ongoing.
Credits: Char


Get the Best Price for your used car
from 500+ dealers in 24 hours

- Convenient and Hassle-Free
- Consumer Protection
Transparent Process
With No Obligation