Traffic Arrangements for Singapore GP

Traffic Arrangements for Singapore GP

Traffic Arrangements for 2010 FORMULA 1 SINGTEL SINGAPORE from 22 September 2010 to 26 September 2010.

OneShift Editorial Team
OneShift Editorial Team
23 Sep 2010

A series of road closures affecting the Marina Centre area will take place from 22 September 2010 to 28 September 2010 to facilitate the setting up and dismantling of the race infrastructure.

The following roads towards the city (1-way through traffic) will be opened to all commuters during morning peak hours (5.00 am - 9.30 am), on 22 September 2010 to 24 September 2010:
a) Nicoll Highway
b) Esplanade Drive
c) Republic Boulevard
d) Bayfront Avenue
e) Temasek Avenue between Raffles Boulevard and Raffles Avenue

On 25 September 2010 (Saturday), only Nicoll Highway and Esplanade Drive (1-way through traffic) will be opened between 5.00am and 9.30am.

The road closures and restricted access details are as follows:
[IMG]http://www.oneshift.com/showroom/uploadimages/resized-20100923100935662.jpg[/IMG]

In addition to the road closures, on 21 September (Tuesday), two lanes of Esplanade Drive in both directions would be closed from 9.30 am onwards to facilitate set up of the Connaught Grandstand. Traffic at this junction is expected to be slow moving when the lane closures are ongoing.

Credits: Char

Local News
Other Articles
Explore moreright arrow
Market Watch: These Small Used Cars Supply Big Fun
Mercedes-Benz Singapore’s New Electric Commercial Vehicles Start From S$144,988 With COE
Audi A5 Sedan First Drive Review: Upsized Luxury
get quote bg
Sell your car at the highest price in Singapore
  • pros
    Convenient and Hassle-Free
  • pros
    Consumer Protection
  • pros

    Transparent Process
    With No Obligation